Churchill House refurbishment project

17.08.2015

Find out more about services

Go to related service Make an enquiry

Project description

Naylors’ Building Consultancy team were instructed to project manage the internal and external repair of a Grade II listed office building and Business Centre, with retail at ground floor, within a Conservation Area in Newcastle city centre; allowing the building to remain in full occupation.

The premises comprise of a large traditionally built property. The property is of free-early Renaissance style, comprising seven stories including extensive basement accommodation, built in 1891 as a bank for Prudential Assurance Company.

The client did not have a defined repair brief; however, we undertook a full Building Survey to identify and categorise the various repairs required with works commencing in a short timescale due to financial and operational pressures.

Our role & responsibility

  • Acting as lead project manager/ contract administrator in managing the project and administrating the building contract.
  • Acting as lead designer to develop tender documentation and obtaining competitive tenders. Obtaining all statutory consents for the repair works.
  • Acting as the CDM Co-ordinator including reviewing the contractor’s construction phase health and safety documentation and programme.
  • Liaising with various members of the design team including structural engineer in order to adopt a repair method that suited and complied with the listed status and operational needs.
  • Assisting the client in forming a plan of action to allow for the requirements of the occupied areas, retaining full occupation of the building throughout the works, thus limiting disruption and allowing completion.
  • Assisting in developing and implementing an individual reporting and monitoring procedure throughout the works due the client’s specific requirements.
  • Assisting in specifying various supplementary works’ packages during the main contracted works.
  • Attending regular progress meetings to ensure that the design and detailing evolved in a manageable manner, maintaining the project budget. Issuing contract instructions in a timely manner in order to instruct the contractor of all design and specification changes.

Project results

The regular meetings allowed further client involvement and due to the nature of the scheme this allowed development of the design to ensure the repairs were efficiently and flexibly implemented, obtaining all statutory consents.

The completed scheme repaired various structural and aesthetic aspects of the property whilst the tenant and other sub-tenants remained in occupation.

Back to all insights

Real results

Kingstown Trade Park, Carlisle

View case study

Successful Office Sale – The Chromazone Building, Team Valley, Gateshead

View case study

DPD, Washington

View case study

Roofing Supplies - Stockton on Tees & Wallsend

View case study

Simonside Industrial Estate, South Shields

View case study

Naylors Gavin Black secures new Newcastle office for Aberdein Considine

View case study

Acquisition and subsequent letting of the Former Wavin Pipes Facility, Meadowfield Industrial Estate, Durham

View case study

398C Princesway, Team Valley, Gateshead - Investment Sale

View case study

Refurbishment and subsequent lettings of Sixty Grey Street, Newcastle upon Tyne

View case study

Balliol Business Park, Newcastle upon Tyne - Building Consultancy

View case study

Get started - turn your real estate into real value.

Book a 30-minute call to discover how we can support you and help maximise the value of your property. Or simply complete our short form and one of our team will get back to you.