Team Valley Business Centre refurbishment project

12.08.2015

Find out more about services

Go to related service Make an enquiry

Naylors’ building consultancy team were instructed to undertake a £600,000 refurbishment of Team Valley Business Centre on behalf of UK Land Estates

PROJECT DESCRIPTION

  • The refurbishment of a 42,000 sq.ft redundant Business Centre, providing industrial and office space, in order to allow the building to be returned to full occupation.

  • The premises comprise a large steel frame property with external profiled cladding and brickwork.

  • The client did not have a defined design brief at the outset of the project, however works were required to commence in a short time frame due to financial and operational pressures

ROLE & RESPONSIBILITY

Naylors were appointed to….

  • Act as lead project manager/contract administrator in managing the project and administrating the building contract.

  • Act as lead designer to develop tender documentation and obtain competitive tenders.

  • Act as the CDM Co-ordinator including reviewing the contractor’s construction phase health and safety documentation and programme.

  • Liaise with various members of the design team including mechanical and electrical consultants and structural engineers, in order to adopt a design brief and ultimately a final design that suited the client’s aesthetic and
    operational needs.

  • Assist the client in forming a plan of action to allow phased release and therefore occupation of the building throughout the works, by structuring the building works into a phased programme confining them to specific sections of the building at any one time, thus limiting disruption and allowing completion.

  • Assist in developing and implementing an individual reporting and monitoring procedure throughout the works due the client’s specific requirements.

  • Assist in specifying various supplementary works packages during the main contracted works.

  • Attend regular design team, finance and contractor meetings in order to ensure that the design evolved in a manageable manner, kept the contractor informed of any design changes requiring to be implemented on
    site, maintaining the project budget.

  • Issue contract instructions in a timely manner in order to instruct the contractor of all design changes.PROJECT RESULTS

  • The tenant has taken occupation of the building following completion of the works.

  • The regular meetings allowed further client involvement and due to the nature of the scheme, this allowed development of the design to improve the design/ layout further during the phases.

  • The completed scheme improved what was a redundant facility with a tenant taking occupation , managing the property.

Back to all insights

Real results

Kingstown Trade Park, Carlisle

View case study

Successful Office Sale – The Chromazone Building, Team Valley, Gateshead

View case study

DPD, Washington

View case study

Roofing Supplies - Stockton on Tees & Wallsend

View case study

Simonside Industrial Estate, South Shields

View case study

Naylors Gavin Black secures new Newcastle office for Aberdein Considine

View case study

Acquisition and subsequent letting of the Former Wavin Pipes Facility, Meadowfield Industrial Estate, Durham

View case study

398C Princesway, Team Valley, Gateshead - Investment Sale

View case study

Refurbishment and subsequent lettings of Sixty Grey Street, Newcastle upon Tyne

View case study

Balliol Business Park, Newcastle upon Tyne - Building Consultancy

View case study

Get started - turn your real estate into real value.

Book a 30-minute call to discover how we can support you and help maximise the value of your property. Or simply complete our short form and one of our team will get back to you.